Residential · Austin, TX

Patios built to outlast the Texas sun

A patio that turns your backyard into the room you actually use.

4.9★ from 142 Austin homeowners
Brick & Stone Patios completed by R&J Masonry in Austin TX
What this service actually solves

Brick & Stone Patios — the honest version.

Most patios in Austin fail the same way: sun-baked concrete cracks, pavers sink at the joints, and a thin mortar bed turns to powder in three summers. We build patios the heavy way — a compacted sub-base, full mortar setting, and proper slope so water never pools against your foundation. You get a surface that stays flat, clean, and cool enough to walk on barefoot in July.

Pool-adjacent note

Pool-adjacent patios need a 1/4" per foot slope away from the pool and the foundation, a sealed coping edge, and a slip-resistant finish. We detail every one of these on the walkthrough.

Material options

Choose your material with eyes open.

Each material has real trade-offs. Here they are, honestly.

Oklahoma Flagstone

Cool underfoot, native to the region, natural cleft texture
–Slightly uneven surface — not ideal for rolling furniture

Limestone (Honed)

Clean modern look, light color reflects heat, precise cuts
–Softer stone — can etch from acidic spills

Clay Brick Pavers

Classic, color-fast, easy to repair individual units
–Darker colors absorb more heat

Travertine

Pool-deck favorite, stays cool, elegant
–Premium price point
The process, step by step

How we build it.

01

Inspect & Measure

We check soil, slope, and drainage. A patio that doesn't shed water is a patio that heaves.

02

Excavate & Base

Dig to depth, lay and compact a crushed-limestone base in two lifts. No shortcuts here.

03

Set in Mortar

Full mortar bed — not a dry sand set — so the surface stays locked for decades.

04

Joint & Seal

Grouted joints, cleaned face, and a breathable sealer that won't trap moisture.

Realistic timeline

How long it takes.

A standard 400–600 sq ft patio runs 7–12 working days, weather permitting. Pool-adjacent work may add 2–3 days for slope and drainage detailing.

What drives the cost

No pricing black box.

Here's exactly what moves the number on your quote — so you can make informed choices, not guesses.

Square footage
Larger footprint = better per-sq-ft rate
Material choice
Flagstone & brick are mid-range; travertine and premium limestone add 30–60%
Site access
Tight side yards, slopes, or fence removal add labor and equipment time
Pool-adjacent work
Drainage, coping, and slope detailing add 1–2 days of labor
Demolition of old surface
Removing an existing concrete slab adds haul-off and disposal
Completed work

Photos of this service, done right.

Brick & Stone Patio in West Lake Hills
West Lake Hills
West Lake Hills Pool Deck Rebuild
Reviews from this kind of work

What clients said after this exact service.

Margaret K.
West Lake Hills · Brick & Stone Patio
Google

"Jose and his crew rebuilt our pool deck in Oklahoma flagstone after the old concrete cracked for the third time. Three years later it's still perfectly level. They showed up when they said they would, every single day."

August 2026
David R.
Round Rock · Tuckpointing
Google

"Our 1960s brick chimney was shedding mortar. Jose mapped every joint on the first visit, explained why it was happening, and the tuckpointing match is invisible. Honest guy, no upsell."

July 2026
Questions, answered

Brick & Stone Patios — your questions

Can you match my existing pool coping?

Yes — we source matching or complementary coping and tie the new patio into the existing deck edge so there's no visible seam or trip hazard.

How long before I can walk on it?

Foot traffic in 24 hours; furniture in 48. We seal after a 7-day cure so the sealer bonds to fully cured stone.

Do you handle the permits?

We pull permits when required by your municipality — most patio builds under 30" of grade don't need one, but we confirm with your city before we start.

Get your free brick & stone patios estimate.

Send a photo of the area and Jose will call you within one business day with an honest assessment and a fixed quote.

I personally review every inquiry. Expect a call or text within one business day. — Jose, Founder

What does your project look like today?

Six fields. One photo. That's it.

I personally review every inquiry. Expect a call or text within one business day. — Jose, Founder

No dead ends

Ready to start?

Every page closes with a way to reach us. This one's no different.

5-year workmanship guarantee on all new construction · I personally review every inquiry. Expect a call or text within one business day.